Commercial Blueprint

November 18, 2005

Western Watt
4015 S. McClintock Drive
Tempe, AZ 85282

Dear Mary:

Commercial Blueprint installed a Power Conditioning System from Western Watt in March of 1988 at our Phoenix location. Before installing this system our facility experienced a great number of brown outs, power fluctuations and power surges that affected our electronic equipment and in some cases resulted in equipment damage.

The installation of your system corrected all of our previous power problems. Since 1988, we have experienced no brown outs, power surges or equipment losses. Our power has maintained a constant voltage which is very important to the operating efficiency of our digital equipment.

In addition, we did see a reduction in our energy usage.

We were so pleased with the capabilities of this system that we installed the equipment in our Tempe location in 1994. We would recommend this system to any business who is interested in eliminating power problems.

If any of your prospective customers would like to discuss the benefits of this equipment, I would be glad to have them contact me at (602) 264-6871.

Sincerely,

Valeri Golish
General Manager
4700 North 12th Street
Phoenix, AZ 85014
(602) 264-4568
FAX (602) 277-0884

The Original Letter:

Image of the Commercial Blueprint Testimonial Letter

Comments are closed.